Menu
Home
Property Search
Oasis Fm Community
DJs/Presenters
Schedule
Breakfast Show
Breakfast Blog
Lunchtime Blog
Sport on Oasis Fm
Playlist
Studio Webcam
Competitions
Audio on Demand
Tenerife Local News
Jobs
Weather
Gallery
Events
TEA Awards
Darts League
Bowling League
Links Page
Tenerife Amable
Guide to Tenerife
Public Services
About Us
Advertise With Us
Coverage Maps
Corporate
Room Service
Canarian Weekly
Contact Us

Listen Live

Real Player Real Player
Media Player Media Player
winamp Winamp

Sky News every hour
Hear the latest bulletin

Studio Webcam
Webcam


On Air Now

Survey
Is this the best Olympic games of all time?

Yes
No it was better when GB had athletics glory



Results
Polls

Votes: 21
Comments: 0

Sport Headlines
·Gerrard misses England qualifiers
·Clubs await Champions League draw
·Murray eyes place in round three
·Chelsea set to seal Robinho deal
·Last-gasp Kuyt puts Liverpool through
·Arsenal cruise into group stages
·Spurs to revive Arshavin interest
·Keothavong clinches historic win
·Smith a doubt for third one-dayer
·Raikkonen defiant over poor form

read more...

Tenerife Today

Tenerife Today is the interactive news page for Oasis Fm, with all local news and cultural information supplied by the Canarian Weekly newspaper, SPET, and Tenerife Cabildo.

 

Plaza de Espana - 25.07.2008
The newly remodelled Plaza de Espana in Santa Cruz has officially opened.

The public area of Santa Cruz composed of the Plaza de Espana, the Duke of Alameda St. Helena and the Plaza de Candelaria, whose renovation has been completed recently, was officially inaugurated last Thursday by the highest representatives of the Cabildo, in an evening where they lit the new and unique lake bordering the Monument to the Fallen and two pavilions.
The Cabildo of Tenerife reopened to the public this week the Plaza de Espana and its surrounding spaces, an area of 36,160 square metres which has undergone remodelling in the past two years and it only remains to complete the required testing techniques filling and emptying the lake. The project was designed by the architectural firm Herzog and Meuron and executed by the joint venture (UTE) constituted by Acciona and VVO Building and Infrastructure Projects.
 



© Copyright Oasis Fm 1997-2008 an Emcan Media company. All rights reserved.